Mega health camp conducted in Ponnavaram village on 04/03/2015.

With an aim to analyse the primary health need of the people of Ponnavaram a Mega health camp was organized, Eminent specialist doctors along with their support staff have attended the camp. The day progressed with an overwhelming response of 95% participation from the villagers.

Total people in the village : 2018
Residing people in the village : 1420
Number of people participated : 1349
Eye care : It was determined that 50 people needed cataract operations. 254 persons are needed power glasses.
Diabetic : Around 30 persons who were unaware of the issue have been diagnosed as Diabetic and were educated.
Heart care : Three cases with blocks in the heart were identified. A twelve year old girl has been detected with heart ailment referred to kims.
Gynaec care : Gynaec education taught by 3 gynaecologists to nearly 400 women. Primarily concentrated on college going girls.4 women suffering with severe gynaec problems addressed to cure.
Dental care : 180 school going children educated about the dental care and tooth brush, paste supplied.
Ortho care : 3 specialists checked ortho related problems and necessary care taken.
Medicines : Rs 22,000 worth of valuable medicines distributed to the people on the prescription of the doctor(s).
Homeo kit : Homeo kit one for each household given to address the general problems.

Action plan for Model village for the months of April and May 2015.
  1. EYE problems free village:
    All people were tested by qualified doctors. based on the advise of the doctors-
    a) Power glasses will be supplied to: 250 ( through government hospital)
    b) Cataract operations will be taken up: 50 ( through government hospital)
  2. Construction of toilets “open defecation free village".
    219 toilets requirements are identified and approved by RWS&S, first phase of work started. Actual estimated cost is Rs 20000, out of that RWS&S contributing 15000. After completion of foundation Rs 6000 will be given.
  3. Acute Drinking water problem in April, May & June months:
    Right now alternative day people are getting water through pipe line. When pipe lines are broken, planned to supply drinking water through tankers.
  4. RO WATER PLANT:
    Before purchase of RO water plant, basement with certain height have to be constructed along with roof.
    bore + bore pump to be arranged.
  5. De silting of water tank ( cheruvu) along with construction of retaining wall with plantation+ tree guards.
  6. Survey of Donka roads and formation of roads with the help local realtors.
  7. Removal of encroachments on 2 streams and construction of check dams to maintain ground water levels.
  8. Skill development programme during the summer in DTP ( DESKTOP PUBLISHING)/ ENGLISH LANGUAGE.
  9. 100% bank accounts for students and others ( jandhan yojana)